/
: / Analytics / Local Governance Assessment in Kyrgyzstan (2005)




Kyrgyzstan Review, 10 years ago




V. ATTACHMENTS

1 Assessment Timetable

Dates
# of work days
Place
Activity and Deliverables
Who
May 2-6
3
Residence
Finalization of the survey tools. Preparation for the field testing. Schedule of the visits (if the permission is received).Preparation of the schedule. Logistical matters
Consultant,
Coordinator
May 10-13
4
Kyrgyzstan
Conduct FGD with the key stakeholders to test indicators.
Consultant, Coordinator, Possibly 1-2 Interviewers
May 14-15
2
Kyrgyzstan
Refinement of indicators set and comprehensive questionnaire with survey tools. Preparation of the training module. Selection of the Interviewers.
Consultant, Coordinator
 
May 16-19
 
3
Kyrgyzstan
Conducting orientation workshop on facilitation skills and orientation with the survey tools and system of reporting.
Drafting the schedule and selection of the potential survey sites.
Logistical/technical matters associated with the field assessment.
Consultant, Coordinator Interviewers
May 20-27
6
Kyrgyzstan
Conducting of the field assessment of the local governance. Coordination, controlling, supervising of the field activity.
Consultant, Coordinator, Interviewers
May 28-30
3
Kyrgyzstan
Collection of the reports and initial analyses.
Consultant Coordinator, Interviewers
June 1-5
2
Residence
Collection/verification of the reports. First analyses available.
Consultant Coordinator
TBD
 
Residence
First draft of the report is submitted
Consultant